ODOT SR 7 Slip Repair | Mingo Junction, Ohio
Follow the River Environmental (FTR) provided comprehensive stormwater and environmental compliance services for the Ohio Department of Transportation’s SR 7 slip repair project in Jefferson County near Mingo Junction. This large-scale slope stabilization effort involves significant excavation, embankment construction, and earth-disturbing activities to address longstanding geotechnical instability along the corridor. Kokosing Construction Company served as […]
View Project
Greenlawn Dam Rehabilitation | City of Columbus, Ohio
Follow the River Environmental (FTR) provided targeted water quality protection services in support of the City of Columbus’s Greenlawn Dam Rehabilitation project (CIP 611038-100002). As part of this work, FTR installed and maintained turbidity curtains within the Scioto River to control the migration of suspended sediments generated during in-water construction activities. Turbidity curtains are floating […]
View Project
Franklin County Engineer’s Office Water Quality Monitoring | Franklin County, Ohio
Follow the River Environmental (FTR) provides comprehensive water quality monitoring and environmental compliance support for the Franklin County Engineer’s Office during active construction projects. Our services include weekly upstream and downstream water sampling to monitor construction-related impacts on local waterways, with field measurements and laboratory analysis conducted in accordance with Ohio EPA requirements. FTR summarizes […]
View Project
City of Groveport MS4 Program Management | Groveport, Ohio
Follow the River Environmental (FTR) provides ongoing management and support for the City of Groveport’s Municipal Separate Storm Sewer System (MS4) program to ensure compliance with Ohio EPA and federal stormwater regulations. Our services include public outreach and education efforts such as rain garden presentations at local farmers markets and stormwater education programs for local […]
View Project
ODNR Project 230002 McConnelsville Dam Removal & Replacement | Morgan County, Ohio
Follow the River Environmental (FTR) provided comprehensive stormwater and site stabilization services for the McConnelsville Dam Removal and Replacement project on the Muskingum River. Our team developed Stormwater Pollution Prevention Plans (SWPPPs) for both the new dam construction and the demolition of the existing dam, and performed monthly stormwater inspections to ensure ongoing regulatory compliance. […]
View Project
ODOT Project 240512 LAW SR 7 Chesapeake Bypass (ODOT)
Our team provided comprehensive stormwater and erosion control support for the Chesapeake Bypass project, which broke ground in April 2025. Working under prime contractor Kokosing Construction Company for the Ohio Department of Transportation, we completed the design of the project’s Stormwater Pollution Prevention Plan (SWPPP) and implemented a full suite of erosion and sediment control […]
View Project